Hydro Power Project Angola

Project: Hydro Power Project
Value: USD 734,000,000
Client: Ministerio Da Energia E Aguas
Website: www.minea.gov.ao

Cuteca is a 203MW hydroelectric project proposed for the Longa river/basin in Cuanza Sul, Angola. The project will be completed in a single phase, with construction beginning in 2024 and commercial operation beginning in 2027. The project, developed by the Ministerio do Energia e Aguas, is planned to generate 873 GWh of power.